Extend service life of machine clothing

A key to more sustainability while reducing costs at the same time.
With our solutions, you can produce more sustainably and at lower costs.
At the same time, you achieve the same or even better product quality.

Why should you think about it?

The more machine clothing you need, the more material consumption and the higher the costs.

  • The more machine clothing is needed, the more material consumption and the higher the costs.
  • The downtime costs for replacing machine clothing are often higher than the material costs themselves.
  • Each machine covering usually requires a certain start-up time. The less often this is necessary, the better for the overall machine efficiency.

How can we support you in this?

With our know-how, products and solutions, we can help you to extend the service life of your machine clothing as follows - and all while maintaining or even improving product quality:

  • Maximizing the running time of the machine clothing without impairing machine operation or product quality.
  • Reduction in downtimes for replacing machine clothing and therefore an increase in overall availability.

Success Stories

Below you will find a selection of successfully implemented projects.

All projects presented…

  • ... show that it is possible to save resources while reducing production cost.
  • ... achieved consistent or even improved product quality.
  • ... have a return on investment of a few months only taking into account the overall added value achieved.
  • ... have been implemented many times - no prototypes or trial installations.

Service life of press felts increased from 4 to 5 weeks.

Savings for project implemented by IBS PPG: € 215.000 per year

TARGETS ACHIEVED

  • Increased service life of felt from 4 to 5 weeks.
  • Approx. 12 felts less needed per year (3x4 felt runs).
  • Less consumable material - does not have to be produced/transported/disposed.
  • Same or even improved product quality.
  • Return on investment within a few months.

Service life of press felts increased by 25%.

Savings for project implemented by IBS PPG: € 58.000 per year

TARGETS ACHIEVED

  • Reduction of the total vacuum requirement.
  • Increase in felt life by 25% from 40 to 50 days.
  • This saves 2 felts per year.
  • Less consumable material - does not have to be produced/transported/disposed.
  • More production due to less downtime.
  • Same or even improved product quality.
  • Return on investment within a few months.

YOU HAVE QUESTIONS OR WANT TO START A NEW PROJECT?

Please contact us.

PAPER
EXPERIENCE

Login

Register

Registration was successful! Please confirm your email address.

Reset Password

Confirm Email