Increase the efficiency of your press section!
- Save Resources +
-
Products & Solutions
+
- Rebuilds & Performance
- Dewatering technology
- Machine cleaning and doctoring systems
- Vacuum control systems
- Fabric tensioning and guiding systems
- Consumables and wear parts
- Steam showers and rewetting systems
- Reel change systems
- Machine vision solutions
- Stock, additive and starch preparation
- Monitoring and control technology
- Metering systems
-
Safety
- safetyMASTER
- iSAFETY
back
- Edge and trim handling
-
Tissue Solutions
- Edge and trim handling (Tissue)
- Machine vision solutions
- Machine cleaning and doctoring systems
- Steam showers and rewetting systems
- Safety
- Fabric tensioning and guiding systems
- Vacuum control systems
- Felt suction systems pressMASTER
- Felt suction systems pressMASTER flex
- flowMASTER
- iFIBER deSAVER
- iFIBER deFLAKER
- 3D-Scanning-Service
back
- Services +
- About us +
- Careers +
Extend service life of machine clothing
A key to more sustainability while reducing costs at the same time.
With our solutions, you can produce more sustainably and at lower costs.
At the same time, you achieve the same or even better product quality.
Why should you think about it?
The more machine clothing you need, the more material consumption and the higher the costs.
- The more machine clothing is needed, the more material consumption and the higher the costs.
- The downtime costs for replacing machine clothing are often higher than the material costs themselves.
- Each machine covering usually requires a certain start-up time. The less often this is necessary, the better for the overall machine efficiency.
How can we support you in this?
With our know-how, products and solutions, we can help you to extend the service life of your machine clothing as follows - and all while maintaining or even improving product quality:
- Maximizing the running time of the machine clothing without impairing machine operation or product quality.
- Reduction in downtimes for replacing machine clothing and therefore an increase in overall availability.
Success Stories
Below you will find a selection of successfully implemented projects.
All projects presented…
- ... show that it is possible to save resources while reducing production cost.
- ... achieved consistent or even improved product quality.
- ... have a return on investment of a few months only taking into account the overall added value achieved.
- ... have been implemented many times - no prototypes or trial installations.
Service life of press felts increased from 4 to 5 weeks.
Savings for project implemented by IBS PPG: € 215.000 per year
TARGETS ACHIEVED
- Increased service life of felt from 4 to 5 weeks.
- Approx. 12 felts less needed per year (3x4 felt runs).
- Less consumable material - does not have to be produced/transported/disposed.
- Same or even improved product quality.
- Return on investment within a few months.
Service life of press felts increased by 25%.
Savings for project implemented by IBS PPG: € 58.000 per year
TARGETS ACHIEVED
- Reduction of the total vacuum requirement.
- Increase in felt life by 25% from 40 to 50 days.
- This saves 2 felts per year.
- Less consumable material - does not have to be produced/transported/disposed.
- More production due to less downtime.
- Same or even improved product quality.
- Return on investment within a few months.
PAPER
EXPERIENCE
IBS Austria GmbH
Hauptstraße 22
8833 Teufenbach-Katsch
Austria
Phone: +43 (0) 3582 8511
E-Mail: Send inquiry




